Electrical Installation and Commissioning, Central Power (Minturn Station 5)
Electrical installation by Central Power, LLC (lump sum base bid)
Permitting, design, and engineering
Installation of 50 kW diesel standby genset package (equipment per package line)
Electrical installation per 2023 NEC
Surface demolition and trenching as needed for the work
New concrete pad with thickened edge for generator
Five (5) new bollards
General conditions: up to 2 months of on-site crews
New service riser and cold sequence meter enclosure
Reconnection of existing panel feeder to SE ATS
New 120 V circuits as required for generator
Conduit to new annunciator location
Modifications to existing grounding and bonding per NEC
Equipment as needed to complete scope
Commissioning and startup assistance
1-year installation warranty
Closeout documents
Not included: retaining wall or elevated pad (may be required; not priced), geotechnical report, underground service (bid assumes overhead service drop), utility fees and coordination, temporary backup generator, private locates, utility daylighting, onsite water, access panels, cutting, patching, painting or repair of building surfaces, painting of conduit or equipment, remediation of existing code violations, sales tax
Scheduling: a minor utility outage of 1-2 days may be required, depending on utility scheduling